September and October: prepare the record

November: confirm readiness

Verify that roof drains and ground discharge paths are clear, loose materials are addressed, and maintenance teams know how to report changes. Keep roof plans, warranties, inspection records, and contractor contacts where the manager and board can retrieve them quickly.

December through February: observe safely

Track snowfall, thaws, visible ice, interior staining, ceiling changes, and drainage behavior. Do not rely on generic snow-depth rules: roof capacity, drifting, wet snow, rooftop equipment, and structural conditions vary. A qualified structural or roofing professional should set building-specific triggers.

Safety boundary: residents, board members, and untrained staff should not climb icy roofs. Snow and ice removal can damage roofing and create fall hazards; use qualified professionals with an appropriate plan.

March and April: compare and close the loop

After safe access returns, inspect the same roof areas, elevations, gutters, and interior locations documented before winter. Note what changed, what stayed stable, what repairs were made, and what should enter the capital plan.

Questions for the board packet

Create a before-winter property record

A condition baseline gives the board a dated reference for maintenance and future comparison.

Review the Property Baseline
Related guidanceHOA Storm Readiness Records ChecklistTwin Cities HOA Exterior Maintenance GuideSpring Exterior Inspection Checklist